The construction plan of  J. Hyneman Center workshops.
The area of the largest hall (called Sammio in this figure), is 240 m2. There will be some machines and several working tables for student groups in this space. The doors near the upper left corner  will open outside, and enable for example driving a car into the hall.
Six smaller workshops on the right side of the figure will be targeted for special purposes; metal work, painting, welding wood work and two electronic workshops.






The furnishing plan is yet to come.