maanantai 27. elokuuta 2018

Action day 23rd of August



Piece by piece everything is getting ready for the opening in J. Hyneman Center. 23rd of August we had an action day, when we had volunteer students helping in building of JHC.
Please find some latest photos of the protolab in the following link:

maanantai 20. elokuuta 2018

Current status of JHC and what is next [WIP]

JHC is slowly, but steadily, building up. Wall of Boxes has been made by Lauri Tuimala, who has been welding so well that his welds are making Joel shoot snarky comments at him. While WoB has been coming nicely, first versions of general safety instuctions have been made.

First version of French Cleat is ready and first Hilti's hand drill have been hanged. Here is proof:
First French Cleat with Hilti's hand drill hanging from it.


 First impressions were positive, then we noticed that my hanger design wasn't ideal, so we had an idea to make special board for Hilti's tools. Next someone has to design it (wink wink ;)

We also have new sponsors, Kiilto sponsoring glues, varnish for wood and other chemicals and Sievi who sponsored really nice safety footwear. Of course we had to make nice wooden shelf for those.

Sievi sponsored good looking and close-fitting safety shoes.
Our next venture was to varnish all work benches and stools. We had a really cool idea to make bulletin board out of metal door, currently it is going through painting process, pics gonna be here when it's ready!

Related to that, where we will this painting happen? In our main work space of course! Our paint shop is next on the list where we will add more stuff, like work table, hood and other basics paint shop materials.


JHC survey 2019

Below is a link to a survey asking students for their views on the JHC. Respondents will draw four sets of two movie tickets (4 x 2)...